Product Category

SCM-A Membrane-Forming Agent High-performance drilling mud additives Best lost circulation material for oil drilling

Shale stabilization additive for water-sensitive formation;

Eco-friendly drilling fluid film-forming agent.

Inquiry Now >

VIDEO

1. Product Overview

SCM-A‌ is a high-performance cationic polymer membrane-forming agent specifically designed for water-sensitive and dispersive formations in drilling operations. It effectively stabilizes wellbore walls by forming a dense, low-permeability film (10–50 μm) through adsorption and pore-plugging mechanisms, reducing fluid invasion by ≥70%‌17. Manufactured by ‌Beijing Sanhe Runjing Technology Co., Ltd.

2.Functions and Characteristics

Rapid Film Formation & Wellbore Protection‌: Forms a nano-scale dense hydration barrier film on wellbore surfaces within ≤15 minutes to prevent fluid invasion‌‌;

Clay Dispersion Inhibition‌: Reduces formation hydration expansion by >40% via charge neutralization and polymer encapsulation;

Salt/Ca²⁺ Contamination Resistance.

High-Temperature Stability‌: Retains ≥90% film strength after aging at 180°C for 16 hours‌‌.

3.Technical Indicators

Application Scenarios & Recommended Formulations

Mixing Procedure:

Base Fluid Prep‌: Adjust pH to 8.5–9.5 using NaOH/KOH‌.

Additive Blending‌:

Gradually add SCM-B at 800–1200 rpm for 20 min‌.

For HTHP conditions: Supplement with 1–2% sulfonated lignite‌.

It is advisable to conduct laboratory tests or field trials to determine the optimal dosage for specific drilling operations.

 

Performance Monitoring‌:

Measure fluid loss every 2 hours using API filter press‌.

Adjust viscosity with CMC-HV or XC polymer as needed‌.

 

4.Packaging & Storage

Packaging‌: 25 kg triple-layer kraft bags

Storage Conditions‌:

Keep dry and protect from direct sunlight and moisture.

‌Validity Period‌: 24 months from production date (see batch code for details).

 

Additional Details

‌Versatile Application‌: The product adaptability allows it to be tailored for different drilling scenarios, ensuring optimal performance and cost-effectiveness.

‌Disclaimer‌: The above information is provided for reference only. Actual performance may vary based on specific drilling conditions and operational practices. Please consult with technical experts for detailed application guidance.

Contact Form

    wanglinghui85@gmail.com